Snow Day!

Right now it’s snowing, and according to the forecasts it’s settled in for 24 hours at least.  I know this is no big deal in 90% of the world, but in London you might as well have announced Armageddon – the supermarket this morning was full of people panic buying beans, soup and long-life milk because they might not be able to get to the shops tomorrow.  It started at 7am and we have a little over an inch settled nearly 9 hours later.  Yes, a whole inch, and to listen to local radio you would think the world was ending.  I know, crazy isn’t it?

What that means for me is some serious ‘snowed in’ crafting time.  Ok, I’m limited to what I can realistically achieve, but I can get some more swatches done for Crochet 102 and maybe even sneak in a few rows of knitting while sitting in front of my open fire with a large brandy.  It would be hot chocolate, except one of the tablets I’m on doesn’t let me eat chocolate!  Which sadist of a pharmaceutical company came up with that one?

Ah, knitting I missed you! The steroids have appeared to have kicked in, and despite having gained 4lbs in the last 4 days and I’m starting to look like some strange drug-induced freakish balloon animal chipmunk my hands have been pretty good.

Good enough that I have been able to do a whole FOUR rows a night, the last 3 nights, on my Jan Sweater.  That equates to a massive distance of about 4cm growth – but growth it is, and to mix metaphors a bird in the hand is better than a kick in the teeth.  Or some such.  Of course my brain has since gone on a flight of fancy as to how much knitting I could now do and catch up on and that complex cabled sweater in lace weight etc… so I’m having to be very strict with myself and that frivolous part of my personality and set very specific limits so I don’t accidentally injure myself or make things worse.  Some is better than none no?

I’ve also had a phone call today to let me know that ‘an opening’ has occurred and instead of waiting 3 months for a physio appointment, they have a slot on Monday!  I have an MRI in early February and it’s all go!

I’ve been hinting and promising the last couple of posts about teaching in 2013.  I can’t reveal dates and suchlike yet, but I can definitely confirm that there will be at least one course from me (in conjunction with Purlescence) this year.  Crochet 102 will take you from ‘beginner’ to ‘wizard’.  Well, OK, maybe a bit below that – magician?  I’ll be covering LOADS, including  how to get a pretty cast on edge, how to get rid of that gap at the edge of your work, how to do shapes other than squares, rectangles and circles, short rows, gauge (*why* it’s important and when we can ignore it), blocking and texture!  There maybe more, but that’s where I’m up to in my notes so far.  There’s more obviously that I’m keeping secret – and there may even be enough for a Crochet 103, as if I put in everything I want to Crochet 102 then the only person who will be able to keep up is me – and that’s a bit pointless.  If you want something specific or want to know if something will be covered then feel free to comment.

If you missed out on last year’s Crochet 101 (Complete Beginners) and would be interested in the course running again you can contact me, or Purlescence direct.

Right now I’m going to get a hot drink and stare out the window for a bit…

 

 

Welcome to 2013

Happy New Year dear reader and friend. I hope that the next 12 months bring you joy and happiness and as little of the salt of life as we can get away with to allow us to fully enjoy and appreciate the good times.

Frankly, I’m hoping for a much better year than 2012.  Seeing as the Incas didn’t predict the end of the world, just a new beginning, i’m really hoping that 2013 signifies that new start, and I have lots and lots planned for the next 12 months.

First up, I’ve been promising pictures of this since I can remember, so here’s the lovely Cloudy Skies Cowl

Cloudy Skies Cowl

I really enjoyed this project, the rustic texture (I got used to working with 4ply or lighter so it was a pleasure to work in a thick worsted), the cable, the kitchner graft.  I love it.  I’m really pleased I was able to do this handspun justice, and it’s given me a lot of confidence to tackle some more stuff in 2013.

I’m going to be good and list out all the projects I am currently doing, and those I want to get to (health allowing) in 2013…  Deep breath and here goes…

Currently in progress…

  • Jan Sweater – this has been ongoing now since August 2011.  Which isn’t good.  Last week I finally acknowledged that the INCH difference in the hem between front and back would not ‘block out’, so despite having passed the arm shaping I took the needles out, ripped back to the 1×1 ribbing and forced myself to knit that extra inch.  Of course, that means I’ve put myself back by a goodly way, but I’ll be happier with the finished sweater, which I am determined to finish this year! (knitting)
  • Bee’s Honeymeade Shawl – I love this yarn, I love this pattern, and it’s been ongoing since October 2011.  Another one I’m determined to finish (tunisian & crochet)
  • Sunset Chameleon Blanket – given the child is due to join the population in February I really need to crack on with this don’t I?! (crochet)
  • Herbie Shawl – another one started back in 2011.  I’m really enjoying this shawl, and am about 50% done.  I find the ‘non-pattern/recipe’ formula very liberating, and much of the stalling on this is deciding what stitch pattern to use next. (knitting)

Projects I want to do / start

  • Queen of the Night Shawl – (*I think you might need to have a Ravelry account to follow that link*) I have the yarn, I have the beads, I have the pattern, but I want to know I’m pretty consistent on the hands before I start this one. (knitting)
  • The Giovannina Stole is another that I have the yarn and pattern for (since 2011) and I even bought my signature needles specifically to do this pattern. (knitting)
  • The Tranquil Hairpin Lace Tunic is pretty high on the list as well
  • Finish the samples for my Crochet 102 course – I’m about 70% done with this, so the end is in sight (making large swatches was never my thing to start with, and doing them repeatedly is dull, but thankfully it is a one time job!)
  • Make samples for other courses in the pipeline, a Crochet 103 (oh yes, boys and girls), a basic Tunisian 101 course, and a Tunisian 102, a Hairpin Lace 101 and a Broomstick Lace 101.  Of  course I need to write the material as well, and all courses will be subject to demand and uptake, but the plan is there…

Of course I have more projects than just those that I have the yarn for, ready to go, (12 to be exact) and I have several projects that I have yarn for and ideas but no set pattern (5 or 6 I think), or I have to write the pattern myself, but I  think only adding 3 official projects to my existing list is probably sensible until we can get my hands reliably fixed.

I also have my 2011 Christmas present from my brother to tackle.

Aurora Cabin Cross Stitch

Gold Collection Aurora Cabin Cross Stitch

Having never done cross stitch before, and this being 16×12 inches, I have my work cut out, but I have a frame and I’m determined to get some of  this done, this year.

So, in short I shall be challenging myself to finish at least 1 sweater, 1 blanket and 2 shawls this year.  Along with improving my tunisian, hairpin, broomstick and teaching skills.  If those go well I want to try my hand at some fairly complex cabling in knitting and in crochet – and oh, yes, I’ve got a knook to play with as well!

What do you want to achieve this year?

The Europeans do it differently!

Saturday dawned bright and very early and very slightly snowy.  But I grew up in the hills and microns of snow won’t stop me and I set out for (what turned out to be a Rogers and Hammerstein “Beautiful Morning”) Purlescence to do a Continental Knitting and Norwegian Purl workshop with Anniken Annis.

The universe (and specifically Transport for London) had other plans.  Having closed, but not updated their website, I found myself at Victoria with no circle line, no useful district line, no bakerloo line… basically the whole of zone 1 was unusable to get to Paddington.

Of course my 20 minute cushion vanished in the face of going via Hammersmith (including a 10 minute delay at Earl’s Court, because, ironically, the train was ahead of schedule) and I arrived at Paddington to watch the train pull out.  I *hate* being late.

At that hour of the morning (it was now 8.15am on a Saturday remember) I then had a very entertaining conversation with the information desk which felt like a maths exam question…

Me: I want to get to Didcot Parkway, I think the next train is 8.57am.  Can you let me know what time it gets there?
Information Desk: Oh, now.  that’s a long train.  it doesn’t get in till 10.30am
Me:oh. ok (keeping in mind the course starts at 10, and the station is about a 25 minute drive from the course room, so I now reckon I’ll be about 1 1/2 hours late)
Information desk: However, the train at 9.30 gets in earlier
Me: [brain going clunk] sorry? a train that leaves more than 30 minutes later gets in earlier?
Information: Yeap, by 15 minutes.
Me: How?  Oh, never mind.

so, having established that I had over an hour to kill (and HUGE thanks go to J of Purlescence for coming and saving me from the station) I thought I’d grab breakfast in the form of a bacon & sausage roll.  I found the only reverse microwave in the world – hot bread, lukewarm sausage and bacon and stone cold tomato sauce which was in the middle of everything.  Blah.

Finally I managed to get to the class, where I wasn’t snubbed by the class for being late (thank you ladies) and I hadn’t missed too much so was able to catch up.

Despite being able to crochet with both hands, I’ve never mastered knitting continental style.  I can ‘pick’ when I knit backwards, but never ‘got’ it normally. I made a mistake in grabbing my signature needles, you definitely need a slightly grabby needle to make this easier.  I still wouldn’t claim I’ve *mastered* it, but I am a lot better than I was, and I (strangely) found purling easier than knitting.  We picked up some great tips for long tail cast on and had conversations that ranged from cable needles to slankets.

My tensioning is still a bit, erm, random at best. I am far too tense when holding my needles but I have made a start and I have a half inch of a basketweave cowl to practice with.

Naturally I picked up a couple of bits in the shop during lunch (some of which has been put to one side for giftmas presents.  The journey home was *much* smoother and enjoyable – but the day couldn’t leave without one last ‘nudge’ and it took me 1hour and 40minutes to get pizza delivered from 1/2 mile away.

now to practice….